Kanban is a pull system that signals replenishment and limits work-in-process, so production follows actual demand rather than forecasts. This is the Kanban from the Stratenity Library, a governed strategic execution asset that is already built for you. It gives your team the full working method for kanban, and it walks through everything from sizing the kanban: calculating the number of cards to kanban in production versus knowledge work. Every asset ships with a worked client example, a clear RACI, defined KPIs, and governance you can defend, so your team adapts it to a live client engagement instead of starting from a blank page.
What this asset covers
This is a preview of the full deliverable. Inside the Stratenity Library, this asset walks your team through the complete method, section by section, with a worked client example threaded throughout.
- Pull versus Push: Why Kanban Exists
- The Kanban Card and the Meaning of the Signal
- Sizing the Kanban: Calculating the Number of Cards
- Supermarkets and Replenishment Loops
- Two-Bin and Other Kanban Variants
- WIP Limits and the Physics of Flow