Executive summary

Just-in-Time produces only what is needed, when needed, in the amount needed, eliminating inventory waste, a pillar of the Toyota Production System. This is the Just-in-Time (TPS) from the Stratenity Library, a governed consulting deliverable that is already built for you. It gives your team the full working method for just-in-time, and it walks through everything from takt, flow, and pull: the JIT trio to SMED and quick changeover. Every asset ships with a worked client example, a clear RACI, defined KPIs, and governance you can defend, so your team adapts it to a live client engagement instead of starting from a blank page.

What is inside

What this asset covers

This is a preview of the full deliverable. Inside the Stratenity Library, this asset walks a consultant through the complete method, section by section, with a worked client example threaded throughout.

  • The Just-in-Time Ideal and the Two Pillars of TPS
  • JIT versus Traditional Batch Production
  • Takt, Flow, and Pull: The JIT Trio
  • Heijunka: Levelling the Production Schedule
  • Jidoka: Autonomation and Quality at the Source
  • Standardised Work as the Foundation
  • SMED and Quick Changeover
  • Supplier Integration and Milk Runs
  • Inventory as Waste: Water and Rocks
  • The Andon and the Right to Stop the Line
  • Building the JIT System: A Sequence of Adoption
  • When JIT Is Fragile: Disruptions and Mitigations
  • Common Pitfalls and the Deliverable Pack
How to use it

Review, download, and activate in 48 hours

Stratenity Library subscribers can review this asset in full, download it, and activate it into a governed, client-ready deliverable in 48 hours rather than weeks. Each asset ships with a worked client example, a clear RACI, defined KPIs, and governance you can defend.

Read the full asset on the Stratenity Library › Not a member yet? Start a free trial to unlock and activate it, or sign in if you already have an account.