A method for deciding who watches the signals, who decides at each tier, and how actions start without waiting for the next meeting.
What the operating model covers
The asset walks a design lead through the committee, forecast cadence, trigger tiers, the action catalog, decision rights, the lender protocol, and controls. It includes an operating model table, a role map, and an approval matrix, with a worked synthetic case.
- The treasury committee and its rhythm
- A weekly forecast with a scenario overlay
- Three trigger tiers: watch, act, protect
- Pre-approved actions with owners and lead times