Executive summary

A method for releasing each stage of a partnership only when graded, shared evidence supports it.

What is inside

What the governance and acceptance pack covers

The asset walks a governance lead and both sponsors through the gate map, criteria, between-gate controls, the grading standard, decision rights across two organizations, conditions, exceptions, and acceptance records. A worked synthetic case runs a stage gate where stage 1 performs and stage 2 is held.

  • The gates between signing a partnership and renewing or exiting it
  • Go-live, contribution, stage, and term review gates
  • Acceptance criteria traced to the approved structure
  • Controls that run between gates and the evidence each produces
  • A grading standard both partners accept
  • Non-waivable triggers drawn from the switching values
  • Acceptance records that support renewal, change, or exit