Executive summary

A method for deciding, on evidence, whether each leakage control may go live and each phase may close.

What is inside

What the evidence pack covers

The asset walks a gate owner through the gate structure, criteria, the control evidence register, exceptions, the review, and the acceptance record. It includes a gate checklist, a control evidence register, and an acceptance record template, with a worked synthetic case.

  • The gates leakage controls pass in their first 18 months
  • Acceptance criteria tied to the design and conditions
  • Mandatory criteria for price match, completeness, and rollback
  • The evidence each gate needs and who produces it

Create a free account to view the full page