Executive summary

A method for deciding, on evidence, whether production may move to a supplier and an in-house line may close.

What is inside

What the evidence pack covers

The asset walks a gate owner through the gate structure, criteria, the control evidence register, exceptions, the review, and the acceptance record. It includes a gate checklist, a control evidence register, and an acceptance record template, with a worked synthetic case.

  • The gates sourcing switches pass in their first 24 months
  • Acceptance criteria tied to the decision and conditions
  • Mandatory criteria for yield, stock, contracts, and retained capability
  • The evidence each gate needs and who produces it

Create a free account to view the full page