Executive summary

A method for deciding, on evidence, whether a workload may move to a cheaper routing policy and stay there.

What is inside

What the evidence pack covers

The asset walks a gate owner through the gate structure, criteria, the control evidence register, exceptions, the review, and the acceptance record. It includes a gate checklist, a control evidence register, and an acceptance record template, with a worked synthetic case.

  • The gates routing changes pass
  • Acceptance criteria by gate
  • Mandatory criteria for task success, severe errors, latency, regression, fallback, and data approval
  • The evidence each gate needs and who produces it

Create a free account to view the full page